AT 7.30 PM OSA SLC-1/PAD 2 TIME, 11.30 AM US. TIME, ORBIT-1/B3 V2.0 LAUNCHED M-CGIS SAT TO THE ORBIT. EVERYTHING WAS NORMAL. BUT IN PAYLOAD DEPLOY, CRAFT ADAPTER DOESN'T WORK,AFTER THEN IT EXPLODE AND SATELLITE DAMAGED. PLANNED ORBIT WAS 500-500 KM, BUT SATELLITES ORBIT CHANGED 1500-1498KM ALTITUDE AFTER EXPLOSION.
OSA MISSION CONTROL
Tags
Announcement1 Comment
No Upvotes
Log in in to upvote this post.
OCCS-2 MISSION NOT DELAYED. ITS LAUNCH TIME DOESN'T CHANGED. PLANNED OCCS-2 LAUNCH TIME: 25TH OF JULY 2022.