Fusion Space is targeting Monday, November 15th at 16:30 GMT for the second demonstration launch of Fusion Two Renewed edition from Pad 01B at the National Space Center. The vehicle will not be carrying a payload on this flight but the first stage booster (FB2007.0) will attempt a powered landing at a targeted splashdown site one just east of the launch pad. We’ll also be attempting multiple re-lights of the Aeolus 2 engine on the second stage.
We are flying an additional demonstration mission due to the incident that occurred during the last flight.
Payload Mass: N/A
Orbit:
Apoapsis: 300km
Periapsis: 300km
Inclination: 0°
Mission Timeline
T-0 - Ignition
T+0:03 - Liftoff
T+0:58 - Max Q
T+2:07 - Main Engine Cutoff
T+2:15 - Second Stage Start One
T+2:25 - Stage One Boostback
T+2:36 - Fairing Separation
T+2:55 - Stage One Boostback Shutdown
T+4:50 - Second Engine Cutoff One
T+5:00 Stage One Entry Burn
T+5:26 - Stage One Entry Burn Shutdown
T+6:55 - Stage One Landing Burn
T+7:10 - Stage One Splashdown
T+20:00 Second Engine Start Two
T+20:30 Second Engine Cutoff Two
T+50:00 Second Engine Start Three
T+50:15 Second Engine Cutoff Three
Tenth Fusion Space mission of 2024
Fifteenth Mission overall
Webcast will go live at T-7 minutes on Youtube