LunaRock-2 Launch Webcast

This forum post will follow LunaRock-2 as it heads to Luna to complete a sample return mission. Here you can follow the progress of the mission and wait for the live landing stream.


Events in order

  • Health Checks | 20.1.25 | COMPLETED | The spacecraft remains healthy after launch


  • TLI | 26.1.25 | COMPLETED | LunaRock-2 successfully completed a TLI burn earlier today. The third stage will perform a capture burn to get into Luna orbit tomorrow.


  • Luna Capture Burn | 27.1.25 |COMPLETED| LunaRock-2 successfully entered a 50km Luna orbit at a 45° inclination. The third stage was successfully separated. It will move itself into a graveyard orbit.


  • Health Checks | 30.1.25 | COMPLETED | LunaRock-2 continues to be healthy. Teams are currently selecting the best landing site using imagery collected from the spacecraft. 


  • Landing Site Selection | 3.2.25 | COMPLETED | Both of LunaRock-2's landing sites have been selected


  • De-Orbit Burn | 4.2.25 | COMPLETED | LunaRock-2 has successfully completed a de-orbit burn ahead of landing 


  • Live Landing | 4.2.25 |COMPLETED | LunaRock-2 has successfully completed its first landing with a little scare in the final moments but there is no evidence of damage to the critical systems.


  • Sample Collection | 6.2.25 | COMPLETED | LunaRock-2 completed its first round of sample collection


  • LunaRock-2 Relocation Hop | 8.2.25 |COMPLETED | LunaRock-2 successfully conducted an 11-minute flight. For additional video, you can check our Twitter. 


  • Sample Collection 2 | 10.2.25 | COMPLETED | LunaRock-2 completed its second round of sample collection. Teams will begin preparations for the launch of the return capsule over the next few days.


  • Other Experiments | 12.2.25 |CANCELLED | LunaRock-2 needs to conserve extra battery power for its return


  • Ascent Stage Launch | 16.2.25 |COMPLETED | LunaRock-2 performed a completely successful burn, but the expected splashdown site is farther east than expected. This shouldn't be an issue.


  • Trajectory Adjustments | 17.2.25 | COMPLETED | LunaRock-2 is scheduled to splashdown on February 17th at 15:00 GMT. Re-entry will start roughly 15-20 minutes before splashdown.


  • Re-Entry | 17.2.25 |COMPLETED | LunaRock-2 survived an extremely steep re-entry with a terminal velocity of ~4500m/s slowing to just 1000m/s in less than 30 seconds Click to see Re-Entry Video


  • Touchdown | 17.2.25 | COMPLETED |Recovery ship inbound! End of thread.


Live Landing Stream


Live Imagery Thread

LunaRock-2 after payload separation with ISX’s Hellcat engine in view

LunaRock-2 in orbit

HellCat engine after health checks in the morning (23.1.25)

LunaRock-2 Spacecraft

LunaRock-2 after the TLI burn

LunaRock-2 on its way to Luna (GIF)

LunaRock-2 in orbit of Luna

HellCat third stage visible after separation

LunaRock-2 during sunset

Possible landing site image

LunaRock-2 T-24 hours before landing attempt one

LunaRock-2 has landed!

LunaRock-2 sampling

LunaRock-2 liftoff

LunaRock-2 coasting

LunaRock-2 lands for a second time!

LunaRock-2’s last sample collection

Droo from Luna

LunaRock-2 liftoff video

LunaRock-2 burning for Droo

LunaRock-2 coasting

Solar arrays deployed

Droo and Brigo

Alternate angle

2 Comments

1 Upvote

Log in in to upvote this post.