Fusion Space is targeting April 18th at 21:00 BST for the launch of the Proxima 1.2 to Luna onboard F2RE from Pad 01B at the National Space Center.

This will be the third flight for this first stage (B2008) which previously launched LunaRock-1 and MachCloud M1. The first stage will be recovered at our LZ-1 site. The first stage has also been coated in a new TPS paint which should not darken during atmospheric re-entry, helping to protect our vehicles and improve reusability.

To increase performance for this flight, the second stage will be equipped with an expanding nozzle. This will allow us to properly dispose of the second stage in the atmosphere after it orbits around Luna.

The webcast will start at T-10 minutes!


Proxima 1.2 payload integration

Proxima 1.2

Proxima 1.2 is part of a series of missions designed to test the ProximaX spacecraft, which is built by MachX Industries. It is a mash-up between two different spacecraft, including hardware which will enable Luna landing capability for MachX Industries in the future. The spacecraft will be the heaviest payload ever sent to Luna, weighing around 18.2 tons

Proxima 1.2 will be sent on a TLI which will bring it as close as 1000km from the surface of Luna.


Mission Timeline

Pre-Launch Timeline
T-1:00:00 - FD Conducts Go/No Go Poll
T-50:00 - Propellant Load S1 & S2
T-45:00 - Proxima 1.2 Propellant Load
T-20:00 - Proxima 1.2 Propellant Load Complete
T-6:30 - Propellant Load Complete
T-5:30 - Strongback Retract
T-4:00 Tanks Pressing For Flight
T-2:00 GSE closeouts
T-1:00 F2RE Flight Computer Enabled
T-0:30 FD Final Go for Launch
T-0:10 Water Deluge
T-0:05 Aeolus Startup Sequence


Launch Timeline
T+0:00 - Liftoff
T+1:03 - Max Q
T+2:13 - Main Engine Cutoff
T+2:15 - Stage Separation
T+2:23 - Second Stage Start One
T+2:32 - Stage One Boostback
T+2:45 - Fairing Separation
T+3:01 - Stage One Boostback Shutdown
T+5:09 -Second Stage Cutoff One
T+6:10 - Stage One Landing Burn
T+6:50 - Stage One Landing at LZ-1
T+7:00 - Second Stage Start Two
T+7:38 - Second Stage Cutoff Two
T+43:02 - Second Stage Start Three
T+45:10 - Second Stage Cutoff Three
T+46:10 - Proxima 1.2 Deployment
T+16:40:02 - Second Stage Trajectory Correction
T+32:10:05 - Second Stage Re-Entry


F2RE awaiting launch

F2RE vertical at Pad 01B

Discord | Youtube | Twitter | BlueSky

Tags
Roleplay

1 Comment

3 Upvotes

Log in in to upvote this post.