Chandrayaan-1 was the first Indian lunar probe under Chandrayaan program. It was launched by the Indian Space Research Organisation in October 2008, and operated until August 2009. The mission included a lunar orbiter and an impactor. India launched the spacecraft using a PSLV-XL rocket on 22 October 2008 at 00:52 UTC from Satish Dhawan Space Centre, at Sriharikota, Andhra Pradesh. The mission was a major boost to India's space program, as India researched and developed its own technology in order to explore the Moon. The vehicle was inserted into lunar orbit on 8 November 2008.

GENERAL INFO

  • Created On: iOS
  • Game Version: 0.9.404.0
  • Price: $40,329k
  • Number of Parts: 96
  • Dimensions: 64 m x 7 m x 8 m

PERFORMANCE

  • Total Delta V: 6.7km/s
  • Total Thrust: 22.7MN
  • Engines: 14
  • Wet Mass: 4.76E+5kg
  • Dry Mass: 62,746kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 9 1.8km/s 17.1MN 2.1m 4.76E+5kg
4 3 4.2km/s 5.3MN 1.6m 1.95E+5kg
7 1 535m/s 44kN 3.2m 17,335kg
9 1 99m/s 260kN 3s 8,855kg

2 Comments

2 Upvotes

Log in in to upvote this post.