253 downloads

Zhuque 3 is a pricate Chinese aerospace company,Blue Arrow Aerospace.
The Zhuque 3 test aircraft will be launched on September 11,2024.
Zhuque 3 testing machine propellant is liquid oxygen methane.
Zhuque No.3 testing machine uses a Tianhe 12A engine.
AG2 control grid rudder
AG3 control fuel inection arm
AG4 controls the launch pad camera
Congratulatios on the completion of the task of the Zhuque 3 testing machine

GENERAL INFO

  • Created On: Windows
  • Game Version: 1.3.116.0
  • Price: $8,071k
  • Number of Parts: 2045
  • Dimensions: 22 m x 24 m x 19 m

PERFORMANCE

  • Total Delta V: 211m/s
  • Total Thrust: 810kN
  • Engines: 1
  • Wet Mass: 6.09E+5kg
  • Dry Mass: 5.68E+5kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 1 211m/s 810kN 2.6m 6.09E+5kg

1 Comment

13 Upvotes

Log in in to upvote this post.