If the Gemini project can be a little bit more crazy, maybe the United States can win earlier
This is a crazy plan. How to save fuel depends on you
GENERAL INFO
- Created On: Windows
- Game Version: 0.9.205.0
- Price: $140,661k
- Number of Parts: 557
- Dimensions: 67 m x 17 m x 7 m
PERFORMANCE
- Total Delta V: 37.1km/s
- Total Thrust: 71.1MN
- Engines: 24
- Wet Mass: 1.92E+6kg
- Dry Mass: 10,269kg
STAGES
Stage | Engines | Delta V | Thrust | Burn | Mass |
---|---|---|---|---|---|
1 | 4 | 5.2km/s | 33.5MN | 2.1m | 1.53E+6kg |
2 | 0 | 0m/s | 0N | 0s | 4.92E+5kg |
3 | 0 | 0m/s | 0N | 0s | 62,473kg |
4 | 1 | 31.9km/s | 3.1MN | 2.8m | 62,473kg |
5 | 0 | 0m/s | 0N | 0s | 13,112kg |
10 | 0 | 0m/s | 0N | 0s | 3,968kg |
12 Comments
- Log in to leave a comment
-
13.0k LingDonYao
@QuickNils Turn on the landing leg option and pull down the slider S1
-
-
-
-
13.0k LingDonYao
@Kevon87 Thank you for your link, because my English is poor, so I need to watch the video slowly
-
-
225 DrooKosmos
@LingDonYao I think the details were a little different (The Command module was launched separate from the lander and they rendezvous in orbit). I read it somewhere, but I can't quite remember where.
Edit: https://youtu.be/0spmj_0Un4k found it.
-
181 CaptainCaleb
I believe it would have used a seperate launch of a dockable centuar much like the Agena and gone to the moon that way. Not with massive landing legss but still a cool creation. The lander was going to be open cockpit too.
-
-
225 DrooKosmos
IIRC, this was a real thing. If the Apollo project didn't pan out, they planned on using the an upgraded Gemini as a backup.
-
@LingDonYao
氧化钙,您才是真的大佬!!!