3 downloads
Auto Credit Based on OriginalName117's GSLV Mark III

The Chandrayaan-1 was the first lunar mission of the ISRO this mission consisted of an orbiter and an impactor (I know it was not the one launched in the GSLV MARK III but it is very difficult to do the PSLV and also this version does not include an impactor) This probe also had a lunar surface mapper and also a small motor and a single solar panel.

GENERAL INFO

  • Predecessor: GSLV Mark III
  • Created On: Android
  • Game Version: 0.9.704.0
  • Price: $30,220k
  • Number of Parts: 221
  • Dimensions: 62 m x 22 m x 9 m

PERFORMANCE

  • Total Delta V: 53.1km/s
  • Total Thrust: 12.7MN
  • Engines: 8
  • Wet Mass: 6.42E+5kg
  • Dry Mass: -387,523kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 2 4.8km/s 10.4MN 1.9m 6.42E+5kg
2 2 2.3km/s 1.6MN 2.4m 1.52E+5kg
3 1 27.5km/s 205kN 1.02hours 80,955kg
5 1 18.5km/s 31kN 3.1m 1,439kg
8 2 0m/s 457kN 0s 1,439kg

No Upvotes

Log in in to upvote this post.