347 downloads
Auto Credit Based on weebabyseamus's SimpleHeavy Rework

SLS BLOCK 1 CREW
you can adjust the orbit to the moon, make sure stage 1 is used up to 1%. so that stage 2 is sufficient to do TLI.
YOU MUST ROLL PROGRAM, Adjust the Pitch direction you want
try Artemis Mission 1 with this!
1. Launch SLS into orbit (before launch check the position of the moon and rocket 90 to 120 degrees)
-during bososter sepration, ptich direction should be 30-35 degrees
- wait until the apogee <= 90 km, pitch 0 degrees
-Wait until your position changes to Pridgee, and apogee 750 km then turn off stage 1 and activate the release stage
- wait until apogee (750km) then activate stage 2 until pridgee 250 km
- you can wait for the right moon position, then start TLI on pridgee. you can adjust with the help of trajeoctary orbit.
2. time on the moon
-pridge 30 km, apogee 6,000 km
-when at 6000 km then make cilcular orbit.
-after 1 lap, burn up to a pridgee of 30 km
-when at 30 km, do the burning back to earth (this is quite difficult, because it requires precise calculations to do the burning back to earth)

IF YOU WANT TO MAKE CILCULAR in lunar orbit
ORION CAN ONLY => 200 KM CILCULAR ORBIT in Luna, because delta V is only a little. after all, Orion actually only reaches an orbit of 300 and 6,000 km if there is already GATEWAY.

GENERAL INFO

  • Predecessor: SimpleHeavy Rework
  • Created On: Windows
  • Game Version: 0.9.306.0
  • Price: $52,991k
  • Number of Parts: 139
  • Dimensions: 94 m x 17 m x 9 m

PERFORMANCE

  • Total Delta V: 5.7km/s
  • Total Thrust: 13.1MN
  • Engines: 18
  • Wet Mass: 8.9E+5kg
  • Dry Mass: 28,225kg

STAGES

Stage Engines Delta V Thrust Burn Mass
1 4 1.4km/s 3.4MN 5.1m 8.9E+5kg
2 2 1.9km/s 8.8MN 2.1m 8.9E+5kg
3 0 0m/s 0N 0s 5.5E+5kg
5 4 46m/s 515kN 49s 5.5E+5kg
7 1 1.5km/s 111kN 5.9m 32,663kg
8 1 800m/s 43kN 3.8m 14,116kg

1 Comment

6 Upvotes

Log in in to upvote this post.