21 downloads

In the first mission of project Ares, the fusion-powered Knight-1 Heavy Launcher second stage flew from Droo to Cylero in 27 days. The rocket then flew into a 500-600 kilometer orbit around Cylero, capturing surface data. It then made a retrograde burn and entered Cylero's atmosphere, measuring data up to the moment when it impacted the surface. This concluded the first Ares mission.

GENERAL INFO

  • Created On: Android
  • Game Version: 0.9.704.0
  • Price: $630k
  • Number of Parts: 4
  • Dimensions: 2 m x 6 m x 2 m

PERFORMANCE

  • Total Delta V: 0m/s
  • Total Thrust: 0N
  • Engines: 0
  • Wet Mass: 1,641kg
  • Dry Mass: 1,635kg

STAGES

Stage Engines Delta V Thrust Burn Mass

3 Comments

3 Upvotes

Log in in to upvote this post.