DUST rolled out to pad for 3rd launch attempt after Saturday Scrub due to Payload Fitting Issues
8,060
TerraSpaceYT
1.6 years ago
Auto Credit Based on TerraSpaceYT's Dust Kickstage fitted atop its second stage prior to launch after friday scrub
Dust has been rolled out to the launch pad for a 4th attempt at launch, fridays attempt was scrubbed due to not bieng ready to launch, saturday's launch was scrubbed due to issues while fitting dust to its kickstage, but we are now just hours away from the fully intergrated launch of DUST to the Jovian System
GENERAL INFO
- Predecessor: Dust Kickstage fitted atop its second stage prior to launch after friday scrub
- Successors 1 craft(s)
- Created On: Windows
- Game Version: 1.0.8.0
- Price: $995,037k
- Number of Parts: 233
- Dimensions: 100 m x 26 m x 30 m
PERFORMANCE
- Total Delta V: 91.6km/s
- Total Thrust: 36.7MN
- Engines: 24
- Wet Mass: 1.35E+6kg
- Dry Mass: 8.47E+5kg
STAGES
Stage | Engines | Delta V | Thrust | Burn | Mass |
---|---|---|---|---|---|
1 | 12 | 45.4km/s | 23.4MN | 16.6m | 1.35E+6kg |
3 | 1 | 1.4km/s | 7.7MN | 65s | 4.27E+5kg |
5 | 1 | 200m/s | 543kN | 83s | 2.32E+5kg |
7 | 3 | 40.8km/s | 2.2MN | 34,501,762years | 2.13E+5kg |
9 | 1 | 3.7km/s | 508kN | 37s | 10,876kg |
4 Comments
2 Upvotes
Log in in to upvote this post.
@DSpacee LOL, no