Auto Credit Based on Pedro's First Orbit Designer Tutorial w/ Flight Tutorial Mockup
For Lunar Rover career mission. Activate Push Engine when arriving at crater edge mountains. Stage after landing (the landing engines will fly away). Drive not faster than 15m/s. Very low cog. Saves you many hours of trying your own solution (what can be fun as well).
GENERAL INFO
- Predecessor: First Orbit Designer Tutorial w/ Flight Tutorial Mockup
- Created On: Windows
- Game Version: 1.0.9.5
- Price: $8,099k
- Number of Parts: 53
- Dimensions: 5 m x 7 m x 7 m
PERFORMANCE
- Total Delta V: 2.0km/s
- Total Thrust: 693kN
- Engines: 13
- Wet Mass: 35,436kg
- Dry Mass: 18,207kg
STAGES
Stage | Engines | Delta V | Thrust | Burn | Mass |
---|---|---|---|---|---|
5 | 4 | 1.5km/s | 257kN | 2.8m | 35,436kg |
6 | 0 | 0m/s | 0N | 0s | 19,367kg |
7 | 1 | 488m/s | 47kN | 3.1m | 19,367kg |
1 Comment
No Upvotes
Log in in to upvote this post.
I just used it to drive down the Shackletron crater on Moon (southpole) in RSS :-)