For Lunar Rover career mission. Activate Push Engine when arriving at crater edge mountains. Stage after landing (the landing engines will fly away). Drive not faster than 15m/s. Very low cog. Saves you many hours of trying your own solution (what can be fun as well).

GENERAL INFO

PERFORMANCE

  • Total Delta V: 2.0km/s
  • Total Thrust: 693kN
  • Engines: 13
  • Wet Mass: 35,436kg
  • Dry Mass: 18,207kg

STAGES

Stage Engines Delta V Thrust Burn Mass
5 4 1.5km/s 257kN 2.8m 35,436kg
6 0 0m/s 0N 0s 19,367kg
7 1 488m/s 47kN 3.1m 19,367kg

1 Comment

No Upvotes

Log in in to upvote this post.